We're using 1/8" cedar veneers. The planking along amidship is 3 1/4". Each plank has to be spiled ( scribe ) into position |
Once the first layer is set the planking is epoxyed to the keel, stem and transom. With that done the master plank are epoxyed in place for the second layer |
Once the first layer is set the planking is epoxyed to the keel, stem and transom. With that done the master plank are epoxyed in place for the second layer |
Once the first layer is set the planking is epoxyed to the keel, stem and transom. With that done the master plank are epoxyed in place for the second layer |