Building
The Wood-Pussy
click here
To see the drawing of the project being worked on.
Lofting
(drawing the boat out full size)
First we go out back and paint the lofting boards
Setting the stations -- fairing out the water lines -- and drawing the half breath.
"oh ya! Some where along the line the strong back was built."
Next, Building the mold
(Main page)
E mail us