We had done the custom parts for the Library, and now we are now finishing the accent parts. Before |
We enclosed the doorway with columns and, a valance. Matching the existing cabinetry. After |
Top detail, fitted under existing crown. |
Bottom detail. |
Each column raps aroung a 90 degree corner. Before |
Each column consistes of two mittered fluted columns. After |
Top detail, fitted under existing crown. |
Bottom detail. |
One of the AC units to be covered. Before |
First |
Second |
Third |